Re: Irish Papermoney.com Changelog. Version 2.2.1 to v3.0.n CAP4 upgrade
Posted: 05 Nov 2020 13:21
Version 2.2.1 to v2.2.2 CAP4 upgrade
Content Addition Program 4 will see the introduction of sections on Specimen banknotes. Additionally, many existing images will be replaced with better quality versions. These images date from the modem era, and were optimised for small file size. CAP4 will also bring the Historical Timeline up to date, and replace older gif images throughout the site with more up to date images to improve quality. There will be no disruption to the website’s functioning.
Change Phases
Phase One: 30% complete as of 21.12.20
Phase 1: — 48% complete
–Addition of a section on Specimen banknotes of A Series, B Series, C Series notes of signatures not already imaged. This section will include all Legal Tender Note specimens.
–A Series Waterlow Specimens 1928-1960; Central Bank specimens 1974-1977 - Completed 21.12.20
–B Series Central Bank specimens
–C Series Central Bank specimens
–A Series De La Rue Specimen notes 1959-1976
Phase 2: — 60% complete
Upgrade of image quality in image galleries of Irish Government Banknotes.
This will be an on-going progressive upgrade.
–A Series
–B Series
–C Series
–Consolidated Banknotes
–Specimen Banknotes - Completed 03.03.21
Phase 3: — 58% complete
- Images in level 2 and level 3 improvement in quality. Started 01.03.21. - 80% complete.
- The Historical Timeline will be expanded at both ends to include Private Banks from 1670, and Northern Ireland Issues post-2000. Started 01.03.21 - Completed 30.04.21.
- Images on the Historical Timeline will be upgraded to improve quality. Some of these images still date from 2005-2008, and were optimised for a slower internet. Any remaining Low res gif images will be replaced with higher res jpg images. Started 01.03.21. - Completed 30.04.21.
- Addition of new images to Historical Timeline. 0% complete.
- All remaining low res gif images throughout the website on pages down to level 4 will be replaced with jpg images where appropriate. This will leave only thumbnails as gif images. Started 02.05.21 - 40% complete 16.09.21
Content Addition Program 4 will see the introduction of sections on Specimen banknotes. Additionally, many existing images will be replaced with better quality versions. These images date from the modem era, and were optimised for small file size. CAP4 will also bring the Historical Timeline up to date, and replace older gif images throughout the site with more up to date images to improve quality. There will be no disruption to the website’s functioning.
Change Phases
Phase One: 30% complete as of 21.12.20
Phase 1: — 48% complete
–Addition of a section on Specimen banknotes of A Series, B Series, C Series notes of signatures not already imaged. This section will include all Legal Tender Note specimens.
–A Series Waterlow Specimens 1928-1960; Central Bank specimens 1974-1977 - Completed 21.12.20
–B Series Central Bank specimens
–C Series Central Bank specimens
–A Series De La Rue Specimen notes 1959-1976
Phase 2: — 60% complete
Upgrade of image quality in image galleries of Irish Government Banknotes.
This will be an on-going progressive upgrade.
–A Series
–B Series
–C Series
–Consolidated Banknotes
–Specimen Banknotes - Completed 03.03.21
Phase 3: — 58% complete
- Images in level 2 and level 3 improvement in quality. Started 01.03.21. - 80% complete.
- The Historical Timeline will be expanded at both ends to include Private Banks from 1670, and Northern Ireland Issues post-2000. Started 01.03.21 - Completed 30.04.21.
- Images on the Historical Timeline will be upgraded to improve quality. Some of these images still date from 2005-2008, and were optimised for a slower internet. Any remaining Low res gif images will be replaced with higher res jpg images. Started 01.03.21. - Completed 30.04.21.
- Addition of new images to Historical Timeline. 0% complete.
- All remaining low res gif images throughout the website on pages down to level 4 will be replaced with jpg images where appropriate. This will leave only thumbnails as gif images. Started 02.05.21 - 40% complete 16.09.21