SLEP 4 Additions and changes to the main website will go here.
SLEP 4 Overal progress: 85% - https Status: Active as of 11.05.21
This will be a major upgrade of the engineering of the website. Service Life Extension Program upgrade 4 will be a relatively quick operation, and should be completed within 3 months.
The website will be migrated from http to https, triggering a version change up to 3.0.0.
This will cause almost all of the image links in the forum to break. We will speedily relink them all manually, but some disruption will occur. The forum may be taken off-line for a short while.
The change will also cause all google links and other search engine links to break, and all links into the website from other websites to break.
Google will generate a report on this, and fixes will be made based on that report.
Other unforeseen disruption to the main website might also occur.
The site depth will be reduced to a maximum of 5 levels.
Web pages through to level 4 will be modernised for current browsers and search engines.
Images in level 2 and level 3 will be improved in quality. Some of these images date from 1999 and were optimised for dial-up modem speeds at the expense of quality, which is no longer a priority.
Change Phases
Phase One will go live with all of the affected pages being changed in one upgrade.
Phase two will then follow on immediately.
Phase One: Started 01.03.21 — completed 02.05.21. 100%
Adjustments to 574 pages in the top three levels of the website and upgrade of all old images on these pages.
• Site depth reduction to a maximum of 5 levels. Started 01.03.21 — completed 05.03.21. 100%
• Modernisation of web pages through to level 4 for current browsers and search engines. Includes upgrade of SEO. Started 01.03.21 — completed 19.04.21. 100% complete.
Phase Two: 100% complete.
• Migration of website from http to https. 100% complete.
• Fixing of broken links in forum as a result of http to https migration. 100% complete.
Phase Three: 100% complete.
• Fixing of broken external incoming links by means of redirection scripts. 100% complete.
Phase Four: Started 02.05.21 20% complete.
• Adjustment of site pages to be compatible with viewing on mobile phones and tablets. 20% complete.
SLEP 4 Overal progress: 85% - https Status: Active as of 11.05.21
This will be a major upgrade of the engineering of the website. Service Life Extension Program upgrade 4 will be a relatively quick operation, and should be completed within 3 months.
The website will be migrated from http to https, triggering a version change up to 3.0.0.
This will cause almost all of the image links in the forum to break. We will speedily relink them all manually, but some disruption will occur. The forum may be taken off-line for a short while.
The change will also cause all google links and other search engine links to break, and all links into the website from other websites to break.
Google will generate a report on this, and fixes will be made based on that report.
Other unforeseen disruption to the main website might also occur.
The site depth will be reduced to a maximum of 5 levels.
Web pages through to level 4 will be modernised for current browsers and search engines.
Images in level 2 and level 3 will be improved in quality. Some of these images date from 1999 and were optimised for dial-up modem speeds at the expense of quality, which is no longer a priority.
Change Phases
Phase One will go live with all of the affected pages being changed in one upgrade.
Phase two will then follow on immediately.
Phase One: Started 01.03.21 — completed 02.05.21. 100%
Adjustments to 574 pages in the top three levels of the website and upgrade of all old images on these pages.
• Site depth reduction to a maximum of 5 levels. Started 01.03.21 — completed 05.03.21. 100%
• Modernisation of web pages through to level 4 for current browsers and search engines. Includes upgrade of SEO. Started 01.03.21 — completed 19.04.21. 100% complete.
Phase Two: 100% complete.
• Migration of website from http to https. 100% complete.
• Fixing of broken links in forum as a result of http to https migration. 100% complete.
Phase Three: 100% complete.
• Fixing of broken external incoming links by means of redirection scripts. 100% complete.
Phase Four: Started 02.05.21 20% complete.
• Adjustment of site pages to be compatible with viewing on mobile phones and tablets. 20% complete.